Construction of Łódź Fabryczna Railway Station in Łódź

Description of the project

A new, three-level railway station is a key component of the New Downtown of Łódź concept. The station has four platforms and eight tracks. The new station is able to serve 20 times more passengers than the previous infrastructure. The project included modernization of railroad tracks in the direction of Łódź Widzew along the section of about 2.5 km and building a tunnel for long-distance, regional and urban trains, which is about 1700 metres long.

The modern railway station became a part of the multi-modal transport junction, connecting, in the downtown part of the city, urban and conventional railway, long distance buses, city transport and private car transport.

The scope of performance

Due to arrangement by the Parties of the project of an extension of the completion time and a failure to arrange refund of costs associated with the extension, the Contractor hired independent Experts to get technical support in the dispute.

Our Experts and Specialists rendered the following services in association with the dispute:

Preparation of the private evaluation was divided into the following stages:

  • development of methodology for proper calculation of costs associated with prolongation of works for completion with regard to indirect and direct project costs
  • verification of calculations performed by the Contractor on the basis of methodology prepared by the Expert and documents confirming the damages

The private opinion developed by the Expert specified the value of rational claims of the Contractor. This calculation served as a basis for the value of the claim for payment.

During further proceedings, the Experts rendered advisory services consisting of technical support in the mediation procedure until settlement.

Benefits to the Client:

Thanks to the properly developed cost refund calculation methodology in association with extension of the completion time, the Contractor calculated the damages correctly. The clear Expert’s evaluation supported the process of preparation of a court suit, and thus allowed for making a claim in court before completion of the project.

During further proceedings, verification by the Expert of the calculation prepared by the Contractor influenced the effective course of the mediation procedure, which led to settlement between the Contractor and the Employer concerning the additional remuneration for the project implementation of total value of approximately PLN 63 million.

Would you like to take advantage of our services?

Contact us

We are members

Subscribe to our newsletter
get the latest information from us, reports and analysis

Company

The objective of CAS is to prevent disputes during various stages of project implementation and to resolve disputes through the specification of claims and defense against those claims.
As Experts, we provide support during negotiations, mediations and cases under litigation before courts and arbitral bodies to minimize their negative effects and maximize profits.

Get to know more about our company

Team of Experts

The CAS team consists of experienced Experts and Specialists, who have cooperated for over ten years. They have successfully completed projects in such sectors as: power engineering, buildings, infrastructure, sea (maritime sector), mining, crude oil and natural gas, manufacturing and industry.

Get to know our team
Mapa Warszawy z siedzibą CAS Sp. z o.o.

Contact

CAS Sp. z o.o.
ul. Pańska 98/12,
00-837 Warsaw, Poland

KRS: 0000659441
Regon: 366393384
NIP: 527-279-47-55

Follow us

+48 608 470 354
cas@caservices.pl

Contact us
Mapa Warszawy z siedzibą CAS Sp. z o.o.